Skip to main content

ACME Lithium Expands Manitoba Lithium Projects in Canada's Winnipeg River Pegmatite Region

By: Newsfile

Vancouver, British Columbia--(Newsfile Corp. - September 6, 2022) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that it has acquired by staking 10 claims totaling approximately 5196 acres situated near Birse Lake, southeastern Manitoba, Canada, contiguous and directly east of ACME's Shatford Lake project area.

The Birse Lake claim block covers the Birse Lake pluton that has numerous pegmatite occurrences along its periphery. The project claim area has been filed with the Manitoba government and is subject to review and processing. This brings ACME's land holdings in southeastern Manitoba to approximately 17,000 acres or 70 square kilometres.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/135965_110f8ed1944388a5_002.jpg
Figure 1: Shatford Lake and Birse Lake claim areas map

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/7776/135965_110f8ed1944388a5_002full.jpg

ACME's Shatford Lake and Birse Lake claim areas are located strategically and contiguous to the south of Sinomine's world class Tanco Mine, a Lithium, Cesium and Tantalum producer (LCTs) since 1969, located in the pegmatite fields of the southern limb of the Bird River Greenstone Belt (BRGB). ACME's Cat-Euclid Lake project claims are approximately 20 kilometres to the north of the Tanco Mine.

The northern and southern limbs of the Bird River Greenstone Belt contain at least 10 pegmatite fields and host hundreds of individual pegmatite bodies, of which many are classified as complex rare-element Lithium-Cesium-Tantalum (LCT) pegmatites. In both limbs of the BRGB, pegmatites are associated with granitic intrusions into structurally dilatant zones adjacent to major east-west shear zones. Worldwide, LCT pegmatite deposits account for about one-fourth of the world's lithium production, most of the tantalum production, and all the cesium production.

ACME is in the process of completing an extensive summer exploration program at both Cat-Euclid and Shatford Lakes employing remote sensing, structural geology, ground-based geological mapping, and geochemical sampling to localize targets for drilling. Our exploration focus is on spodumene-bearing LCT pegmatites that are a source for high quality lithium that can be converted to lithium carbonate.

Dane Bridge, P. Geol. is a Qualified Person as defined by NI 43-101 and has supervised the preparation of the scientific and technical information that forms the basis for this news release.

About ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, and at Cat-Euclid and Shatford Lakes in southeastern Manitoba.

On behalf of the Board of Directors

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/135965

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.